Capture the sequence
Begin with a context view, then record the subject, identifying detail, measured condition when applicable, and any follow-up view. Use notes for factual observations rather than unsupported conclusions.
Keep records findable
Assign the correct project and contributor. Review by date and project, and use Photo Code lookup when a readable code is present.
Apply the governing standard
An inspection authority may require specific forms, signatures, measurement methods, file formats, or retention. TimeMarkerGps supports documentation; it does not certify the inspection or replace the authority's procedure.